Fill in the details on the left and hit Calculate to see exactly how much product you need — broken down by phase.
About these estimates: Coverage rates assume a properly prepared, porous concrete surface. New or heavily sealed concrete may require a primer coat. Coverage rates: epoxy base ~250 ft²/kit, polyurea ~200 ft²/kit, topcoat ~300 ft²/kit, metallic ~150 ft²/kit. Always add 10–15% for waste, corners, and touch-ups — already included above.